Sludge as a resource for further processing

Once water has been treated at a wastewater treatment plant, sludge is left behind. A large share of its mass is water, so what happens next depends on how effectively that water can be separated. For a water utility, this is a question of site capacity, transport and preparing the material for the following operations.

Anatolii Demchenko’s development

In 2014, specialists from the municipal enterprise Chernihivvodokanal and PHARMADEM Research Center LLC carried out industrial tests of the DEMKUL reagent technology. The reports were submitted on behalf of the director of the research center, Candidate of Chemical Sciences, Doctor of Pharmaceutical Sciences, Professor Anatolii Mykhailovych Demchenko.

In September and early October, the tests were run at sites No. 7 and No. 9. According to the second report, 12,842 m³ of sludge was fed to site No. 7 in November. By the end of the filling cycles, its estimated volume was 5,410 m³, about 58% less than the amount supplied. [1, 2]

The advantage of using existing infrastructure

The working solution of the reagent was fed through a previously installed pumping unit. Water drained through the slotted inserts of the drainage wells already while the site was being filled. This experience supports the possibility of upgrading existing sites without necessarily installing a centrifuge or press at this stage.

The practical value of the approach lies in combining reagent treatment with the work of the drainage. Further costs, product quality and the feasibility of scaling up need to be assessed for each facility. The reports confirm industrial testing; obtaining a finished fuel or fertilizer requires further operations.

The surface of site No. 7 after the filling cycles ended. Photo from A. M. Demchenko’s report, figure 5. Date: 03.10.2014.

Sources

  1. Demchenko A. M. Report on industrial tests of sewage sludge dewatering technology. PHARMADEM Research Center LLC and Chernihivvodokanal, 2014.
  2. Demchenko A. M. Report on industrial tests in the autumn–winter period. PHARMADEM Research Center LLC and Chernihivvodokanal, 2014.

First article in the series